BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

CIP Wash System

Assembly

Clean-in-place spray manifold delivering detergent and rinse water to the belt and enclosure interior. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

CIP Wash System parts and their functions

5 top-level parts · 30 parts in total · full bill of materials below
CIP Wash System parts diagram: 1 wash spray nozzle, 2 wash manifold, 3 wash pump, 4 wash solenoid valve, 5 o-ring set. 30 parts in 5 top-level items.
CIP Wash System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Wash Spray Nozzle 24× Spray-down nozzles
2 Wash Manifold 1× Distribution manifold
3 Wash Pump 1× CIP supply pump
4 Wash Solenoid Valve 3× Detergent and rinse valves
5 O-Ring Set 1× Manifold seals

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for CIP Wash System

5 top-level lines · 5 rows shown · 30 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Wash Spray Nozzle spiral-cooling-conveyor-spray-nozzle 24× 24 · part
2 Wash Manifold spiral-cooling-conveyor-wash-manifold 1× 1 · part
3 Wash Pump spiral-cooling-conveyor-wash-pump 1× 1 · part
4 Wash Solenoid Valve spiral-cooling-conveyor-solenoid-valve 3× 3 · part
5 O-Ring Set oring-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the CIP wash system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks