Balance Tank Assembly
AssemblyConstant-head feed tank maintaining steady suction pressure to the feed pump. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Balance Tank Assembly parts and their functions
7 top-level parts · 11 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Tank Shell | 1× | Vertical cylindrical 316L tank shell, 200 L |
| 2 | Float Valve | 1× | Modulating float valve holding constant liquid level |
| 3 | Level Probe | 2× | Conductivity level probes for low and high alarm |
| 4 | Tank Lid | 1× | Hinged sanitary lid with vent filter |
| 5 | Sterile Vent Filter | 1× | 0.2 micron sterile air vent filter |
| 6 | Tank Outlet Flange | 1× | DN50 sanitary outlet flange to feed pump |
| 7 | O-Ring Set | 4× | EPDM seal set for tank fittings |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Balance Tank Assembly
7 top-level lines · 7 rows shown · 11 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Tank Shell | uht-processing-system-tank-shell | 1× | 1 | · | part |
| 2 | Float Valve | uht-processing-system-tank-float-valve | 1× | 1 | · | part |
| 3 | Level Probe | uht-processing-system-level-probe | 2× | 2 | · | part |
| 4 | Tank Lid | uht-processing-system-tank-lid | 1× | 1 | · | part |
| 5 | Sterile Vent Filter | uht-processing-system-vent-filter | 1× | 1 | · | part |
| 6 | Tank Outlet Flange | uht-processing-system-tank-outlet | 1× | 1 | · | part |
| 7 | O-Ring Set | oring-set | 4× | 4 | · | part |
Where the balance tank assembly is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |