Frame & Structure
AssemblyThe long structural frame that carries the vacuum tunnel level and straight so the belt tracks true, supports the platens and drums, and provides access platforms and the piping runs for the heating, cooling, and vacuum services. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Frame & Structure parts and their functions
5 top-level parts · 6 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Base Frame | 1× | Long base frame |
| 2 | Platen Support | 1× | Platen support rails |
| 3 | Access Platform | 2× | Service platforms |
| 4 | Service Piping | 1× | Service piping |
| 5 | Fastener Set | 1× | Bolts, nuts, and washers. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Frame & Structure
5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Base Frame | vbd-base-frame | 1× | 1 | · | part |
| 2 | Platen Support | vbd-platen-support | 1× | 1 | · | part |
| 3 | Access Platform | vbd-access-platform | 2× | 2 | · | part |
| 4 | Service Piping | vbd-service-piping | 1× | 1 | · | part |
| 5 | Fastener Set | fastener-set | 1× | 1 | · | part |
Where the frame & structure is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |