Vacuum Chamber
AssemblyA long horizontal sealed tunnel that holds the belt and platens under vacuum. Doors along its length give access for cleaning and belt service, and seals at the feed and discharge let product enter and leave while the vacuum holds. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Vacuum Chamber parts and their functions
6 top-level parts · 15 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Chamber Shell | 1× | Tunnel shell |
| 2 | Access Door | 4× | Inspection / service doors |
| 3 | Door Seal | 4× | Door seals |
| 4 | Insulation Jacket | 1× | Insulation jacket |
| 5 | Sight Glass | 4× | Inspection windows |
| 6 | Fastener Set | 1× | Bolts, nuts, and washers. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Vacuum Chamber
6 top-level lines · 6 rows shown · 15 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Chamber Shell | vbd-chamber-shell | 1× | 1 | · | part |
| 2 | Access Door | vbd-access-door | 4× | 4 | · | part |
| 3 | Door Seal | vbd-door-seal | 4× | 4 | · | part |
| 4 | Insulation Jacket | vbd-chamber-insulation | 1× | 1 | · | part |
| 5 | Sight Glass | vbd-sight-glass | 4× | 4 | · | part |
| 6 | Fastener Set | fastener-set | 1× | 1 | · | part |
Where the vacuum chamber is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |