Form-fill-seal machine that doses yogurt into cups, lids them and date-codes them. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Cup Filler parts and their functions

5 top-level parts · 14 parts in total · full bill of materials below
Cup Filler parts diagram: 1 cup denester, 2 fill nozzle, 3 lid sealer, 4 date coder, 5 index conveyor. 14 parts in 5 top-level items.
Cup Filler parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cup Denester 1× Cup denester
2 Fill Nozzle 8× Volumetric fill nozzles
3 Lid Sealer 3 parts 1× Foil lid sealer
4 Date Coder 1× Inkjet date coder
5 Index Conveyor 1× Indexing conveyor

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Cup Filler

5 top-level lines · 8 rows shown · 14 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cup Denester yogurt-production-line-cup-denester 1× 1 · part
2 Fill Nozzle yogurt-production-line-fill-nozzle 8× 8 · part
3 Lid Sealer 3 parts yogurt-production-line-lid-sealer 1× 1 3 assembly
3.1 Heating Element heating-element 1× 1 · part
3.2 Foil Reel yogurt-production-line-foil-reel 1× 1 · part
3.3 Pressure Sensor pressure-sensor 1× 1 · part
4 Date Coder yogurt-production-line-date-coder 1× 1 · part
5 Index Conveyor yogurt-production-line-index-conveyor 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the cup filler is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks