BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Condensate System

Assembly

Collects and removes drip and runoff. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Condensate System parts and their functions

4 top-level parts · 12 parts in total · full bill of materials below
Condensate System parts diagram: 1 sloped drain pan, 2 condensate pump, 3 drain line, 4 level switch. 12 parts in 4 top-level items.
Condensate System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQty
1 Sloped Drain Pan 4×
2 Condensate Pump 4 parts 1×
3 Drain Line 1×
4 Level Switch 2×

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Condensate System

4 top-level lines · 8 rows shown · 12 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Sloped Drain Pan continuous-cooker-food-drain-pan 4× 4 · part
2 Condensate Pump 4 parts continuous-cooker-food-condensate-pump 1× 1 5 assembly
2.1 Pump Impeller continuous-cooker-food-pump-impeller 1× 1 · part
2.2 Pump Motor continuous-cooker-food-pump-motor 1× 1 · part
2.3 Oil Seal oil-seal 1× 1 · part
2.4 Ball Bearing ball-bearing 2× 2 · part
3 Drain Line continuous-cooker-food-drain-line 1× 1 · part
4 Level Switch continuous-cooker-food-level-switch 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the condensate system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks