Shell Ejection and Conveying
AssemblyBlows spent shells from the heads and conveys them out for disposal. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Shell Ejection and Conveying parts and their functions
6 top-level parts · 68 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Air-Blast Shell Ejector | 36× | Air-blast shell ejectors |
| 2 | Shell Drop Chute | 1× | Shell drop chute |
| 3 | Shell Discharge Auger | 1× | Shell discharge auger |
| 4 | Servo Motor 4 parts | 1× | Auger drive motor |
| 5 | Ball Bearing | 4× | Auger bearings |
| 6 | Oil Seal | 2× | Auger shaft seals |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Shell Ejection and Conveying
6 top-level lines · 17 rows shown · 68 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Air-Blast Shell Ejector | egg-breaking-line-shell-ejector | 36× | 36 | · | part |
| 2 | Shell Drop Chute | egg-breaking-line-shell-chute | 1× | 1 | · | part |
| 3 | Shell Discharge Auger | egg-breaking-line-shell-screw | 1× | 1 | · | part |
| 4 | Servo Motor 4 parts | servo-motor | 1× | 1 | 24 | assembly |
| 4.1 | Stator Assembly 3 parts | stator-assembly | 1× | 1 | 3 | assembly |
| 4.1.1 | Stator Core (laminations) | stator-core | 1× | 1 | · | part |
| 4.1.2 | Copper Winding | copper-winding | 1× | 1 | · | part |
| 4.1.3 | Slot Insulation | stator-insulation | 1× | 1 | · | part |
| 4.2 | Rotor Assembly 4 parts | rotor-assembly | 1× | 1 | 19 | assembly |
| 4.2.1 | Rotor Shaft | rotor-shaft | 1× | 1 | · | part |
| 4.2.2 | Rotor Core | rotor-core | 1× | 1 | · | part |
| 4.2.3 | Neodymium Magnet | neodymium-magnet | 16× | 16 | · | part |
| 4.2.4 | Ball Bearing | ball-bearing | 1× | 1 | · | part |
| 4.3 | Encoder | encoder | 1× | 1 | · | part |
| 4.4 | Motor Housing | motor-housing | 1× | 1 | · | part |
| 5 | Ball Bearing | ball-bearing | 4× | 4 | · | part |
| 6 | Oil Seal | oil-seal | 2× | 2 | · | part |
Where the shell ejection and conveying is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |