BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Clean-in-Place System

Assembly

Automated caustic and acid wash circuit. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Clean-in-Place System parts and their functions

4 top-level parts · 14 parts in total · full bill of materials below
Clean-in-Place System parts diagram: 1 CIP supply pump, 2 rotary spray ball, 3 CIP changeover valve, 4 CIP solution tank. 14 parts in 4 assemblies.
Clean-in-Place System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQty
1 CIP Supply Pump 4 parts
2 Rotary Spray Ball
3 CIP Changeover Valve
4 CIP Solution Tank

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Clean-in-Place System

4 top-level lines · 8 rows shown · 14 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 CIP Supply Pump 4 parts fce-cip-pump 1 5 assembly
1.1 CIP Pump Casing fce-cip-pump-casing 1 · part
1.2 CIP Impeller fce-cip-impeller 1 · part
1.3 Ball Bearing ball-bearing 2 · part
1.4 Oil Seal oil-seal 1 · part
2 Rotary Spray Ball fce-spray-ball 3 · part
3 CIP Changeover Valve fce-cip-valve 4 · part
4 CIP Solution Tank fce-cip-tank 2 · part

Where the clean-in-place system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks