Cooling Tunnel
AssemblyInsulated chamber with ambient air or chilled water circulation that sets deposited gummies to 8–15°C in 4–6 minutes before demolding. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Cooling Tunnel
5 top-level lines as of r78668| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Tunnel Shell | gummy-depositor-tunnel-frame | 1× | 1 | · | part |
| 2 | Blower Motor | blower-motor | 2× | 2 | · | part |
| 3 | Cooling Heat Exchanger | gummy-depositor-cooling-coil | 1× | 1 | · | part |
| 4 | Cooling Conveyor | gummy-depositor-conveyor-belt | 1× | 1 | · | part |
| 5 | Drive Belt | drive-belt | 1× | 1 | · | part |