BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Drier Conveyor

Assembly

Perforated tray conveyor moving leaf through the hot-air zones. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Drier Conveyor parts and their functions

4 top-level parts · 21 parts in total · full bill of materials below
Drier Conveyor parts diagram: 1 perforated drier tray, 2 conveyor roller, 3 drive belt, 4 ball bearing. 21 parts in 4 assemblies.
Drier Conveyor parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Perforated Drier Tray Stainless perforated tray that fluidises leaf in the air stream.
2 Conveyor Roller Idler and drive roller supporting and turning the belt.
3 Drive Belt Flexible rubber or polyurethane belt, flat, V, or toothed, that transmits power between pulleys on separate shafts.
4 Ball Bearing Deep-groove radial ball bearing.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Drier Conveyor

4 top-level lines · 4 rows shown · 21 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Perforated Drier Tray tea-processing-line-drier-tray 8 · part
2 Conveyor Roller tea-processing-line-conveyor-roller 4 · part
3 Drive Belt drive-belt 1 · part
4 Ball Bearing ball-bearing 8 · part

Where the drier conveyor is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks