BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Air Circulation

Assembly

The fans and ducts that move hot air across the products for even, fast convection baking. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Air Circulation parts and their functions

5 top-level parts · 41 parts in total · full bill of materials below
Air Circulation parts diagram: 1 circulation fan, 2 fan motor, 3 air ducting, 4 air nozzle, 5 ball bearing. 41 parts in 5 assemblies.
Air Circulation parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Circulation Fan Circulation fans
2 Fan Motor Fan motors
3 Air Ducting Air ducting
4 Air Nozzle 24× Air nozzles
5 Ball Bearing Fan bearings

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Air Circulation

5 top-level lines · 5 rows shown · 41 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Circulation Fan tunnel-baking-oven-circ-fan 4 · part
2 Fan Motor tunnel-baking-oven-fan-motor 4 · part
3 Air Ducting tunnel-baking-oven-duct 1 · part
4 Air Nozzle tunnel-baking-oven-air-nozzle 24× 24 · part
5 Ball Bearing ball-bearing 8 · part

Where the air circulation is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks