BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Band Conveyor

Assembly

The steel mesh or solid band that carries products through the whole tunnel at a set bake time. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Band Conveyor parts and their functions

8 top-level parts · 14 parts in total · full bill of materials below
Band Conveyor parts diagram: 1 baking band, 2 drive drum, 3 tail drum, 4 band tensioner, 5 band tracker, 6 band drive motor, 7 gearbox housing, 8 ball bearing. 14 parts in 8 top-level items.
Band Conveyor parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Baking Band 1× Baking band
2 Drive Drum 1× Drive drum
3 Tail Drum 1× Tail drum
4 Band Tensioner 1× Band tensioner
5 Band Tracker 2× Band trackers
6 Band Drive Motor 1× Band drive motor
7 Gearbox Housing 1× Band gearbox
8 Ball Bearing 6× Drum bearings

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Band Conveyor

8 top-level lines · 8 rows shown · 14 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Baking Band tunnel-baking-oven-band 1× 1 · part
2 Drive Drum tunnel-baking-oven-drive-drum 1× 1 · part
3 Tail Drum tunnel-baking-oven-tail-drum 1× 1 · part
4 Band Tensioner tunnel-baking-oven-band-tensioner 1× 1 · part
5 Band Tracker tunnel-baking-oven-band-tracker 2× 2 · part
6 Band Drive Motor tunnel-baking-oven-band-motor 1× 1 · part
7 Gearbox Housing gearbox-housing 1× 1 · part
8 Ball Bearing ball-bearing 6× 6 · part

Something wrong in this list? Report a problem with this BOM.

Where the band conveyor is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks