Pump Skid

Assembly

Feed, booster and timing pumps that establish flow and pressure through the heat exchanger train. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Pump Skid parts and their functions

4 top-level parts · 71 parts in total · full bill of materials below
Pump Skid parts diagram: 1 feed pump, 2 aseptic booster pump, 3 timing pump, 4 variable-frequency drive. 71 parts in 4 top-level items.
Pump Skid parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Feed Pump 8 parts 1× Centrifugal sanitary feed pump from balance tank
2 Aseptic Booster Pump 6 parts 1× Aseptic booster pump raising regeneration-side pressure
3 Timing Pump 6 parts 1× Positive-displacement timing pump fixing the flow rate
4 Variable-Frequency Drive 3× Variable-frequency drives for the three pumps

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Pump Skid

4 top-level lines · 38 rows shown · 71 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Feed Pump 8 parts uht-processing-system-feed-pump 1× 1 30 assembly
1.1 Pump Casing uht-processing-system-pump-casing 1× 1 · part
1.2 Pump Impeller uht-processing-system-pump-impeller 1× 1 · part
1.3 Mechanical Seal uht-processing-system-mech-seal 1× 1 · part
1.4 Pump Shaft uht-processing-system-pump-shaft 1× 1 · part
1.5 Stator Assembly 3 parts stator-assembly 1× 1 3 assembly
1.5.1 Stator Core (laminations) stator-core 1× 1 · part
1.5.2 Copper Winding copper-winding 1× 1 · part
1.5.3 Slot Insulation stator-insulation 1× 1 · part
1.6 Rotor Assembly 4 parts rotor-assembly 1× 1 19 assembly
1.6.1 Rotor Shaft rotor-shaft 1× 1 · part
1.6.2 Rotor Core rotor-core 1× 1 · part
1.6.3 Neodymium Magnet neodymium-magnet 16× 16 · part
1.6.4 Ball Bearing ball-bearing 1× 1 · part
1.7 Ball Bearing ball-bearing 2× 2 · part
1.8 Oil Seal oil-seal 2× 2 · part
2 Aseptic Booster Pump 6 parts uht-processing-system-booster-pump 1× 1 27 assembly
2.1 Pump Casing uht-processing-system-pump-casing 1× 1 · part
2.2 Pump Impeller uht-processing-system-pump-impeller 1× 1 · part
2.3 Mechanical Seal uht-processing-system-mech-seal 1× 1 · part
2.4 Stator Assembly 3 parts stator-assembly 1× 1 3 assembly
2.4.1 Stator Core (laminations) stator-core 1× 1 · part
2.4.2 Copper Winding copper-winding 1× 1 · part
2.4.3 Slot Insulation stator-insulation 1× 1 · part
2.5 Rotor Assembly 4 parts rotor-assembly 1× 1 19 assembly
2.5.1 Rotor Shaft rotor-shaft 1× 1 · part
2.5.2 Rotor Core rotor-core 1× 1 · part
2.5.3 Neodymium Magnet neodymium-magnet 16× 16 · part
2.5.4 Ball Bearing ball-bearing 1× 1 · part
2.6 Ball Bearing ball-bearing 2× 2 · part
3 Timing Pump 6 parts uht-processing-system-timing-pump 1× 1 11 assembly
3.1 Lobe Rotor uht-processing-system-lobe-rotor 2× 2 · part
3.2 Lobe Pump Housing uht-processing-system-pump-housing 1× 1 · part
3.3 Helical Gear Pair gear-pair 1× 1 · part
3.4 Gearbox Housing gearbox-housing 1× 1 · part
3.5 Ball Bearing ball-bearing 4× 4 · part
3.6 Oil Seal oil-seal 2× 2 · part
4 Variable-Frequency Drive uht-processing-system-vfd 3× 3 · part

Something wrong in this list? Report a problem with this BOM.

Where the pump skid is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $5–$2k. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Kirloskar
kbl.co.in ↗
Pune, IN Pumps & fluid systems 200 units 6–10 wks
🇨🇳Leo Group
leo.com.cn ↗
Taizhou, CN Pumps 200 units 6–10 wks
🇮🇳Shakti Pumps
shaktipumps.com ↗
Pithampur, IN Pumps 200 units 6–10 wks
🇨🇳CNP Pumps
cnppumps.com ↗
Hangzhou, CN Pumps 200 units 6–10 wks
🇮🇳Roto Pumps
rotopumps.com ↗
Noida, IN Pumps 200 units 6–10 wks