BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Timing Pump

Assembly

Positive-displacement rotary lobe pump fixing the volumetric flow that sets holding time. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Timing Pump parts and their functions

6 top-level parts · 11 parts in total · full bill of materials below
Timing Pump parts diagram: 1 lobe rotor, 2 lobe pump housing, 3 helical gear pair, 4 gearbox housing, 5 ball bearing, 6 oil seal. 11 parts in 6 assemblies.
Timing Pump parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Lobe Rotor Tri-lobe rotors
2 Lobe Pump Housing Rotor housing
3 Helical Gear Pair Timing gears synchronizing the rotors
4 Gearbox Housing Gearbox housing
5 Ball Bearing Rotor shaft bearings
6 Oil Seal Shaft seals between gearbox and product

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Timing Pump

6 top-level lines · 6 rows shown · 11 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Lobe Rotor uht-processing-system-lobe-rotor 2 · part
2 Lobe Pump Housing uht-processing-system-pump-housing 1 · part
3 Helical Gear Pair gear-pair 1 · part
4 Gearbox Housing gearbox-housing 1 · part
5 Ball Bearing ball-bearing 4 · part
6 Oil Seal oil-seal 2 · part

Where the timing pump is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $5–$2k. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Kirloskar
kbl.co.in ↗
Pune, IN Pumps & fluid systems 200 units 6–10 wks
🇨🇳Leo Group
leo.com.cn ↗
Taizhou, CN Pumps 200 units 6–10 wks
🇮🇳Shakti Pumps
shaktipumps.com ↗
Pithampur, IN Pumps 200 units 6–10 wks
🇨🇳CNP Pumps
cnppumps.com ↗
Hangzhou, CN Pumps 200 units 6–10 wks
🇮🇳Roto Pumps
rotopumps.com ↗
Noida, IN Pumps 200 units 6–10 wks