Bed and Base
AssemblyA single heavy bed casting that fixes the table height and provides the longitudinal guideways. Unlike a knee mill, the bed does not move up and down, so the structure is stiffer and the machine takes heavier cuts without losing accuracy. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bed and Base parts and their functions
6 top-level parts · 15 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Bed Casting | 1× | Heavy ribbed bed casting |
| 2 | Base Casting | 1× | Floor base supporting the bed |
| 3 | Longitudinal Way | 2× | Hardened longitudinal guideways |
| 4 | Way Cover | 4× | Telescoping way covers |
| 5 | Leveling Foot | 6× | Leveling and anchoring feet |
| 6 | Fastener Set | 1× | Structural bolts and dowels |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Bed and Base
6 top-level lines · 6 rows shown · 15 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Bed Casting | btm-bed-casting | 1× | 1 | · | part |
| 2 | Base Casting | btm-base-casting | 1× | 1 | · | part |
| 3 | Longitudinal Way | btm-longitudinal-way | 2× | 2 | · | part |
| 4 | Way Cover | btm-way-cover | 4× | 4 | · | part |
| 5 | Leveling Foot | btm-leveling-feet | 6× | 6 | · | part |
| 6 | Fastener Set | fastener-set | 1× | 1 | · | part |
Where the bed and base is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |