Base & Ways
AssemblyMineral-cast base carrying the work axis and the wheelhead infeed slide. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Base & Ways parts and their functions
6 top-level parts · 16 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Base Casting | 1× | Polymer-concrete base giving high damping for chatter-free lobe grinding. |
| 2 | Longitudinal (Z) Way | 2× | Hardened way along which the wheelhead is positioned over each lobe and journal. |
| 3 | Wheelhead (X) Way | 2× | Hydrostatic infeed way carrying the wheelhead toward the cam. |
| 4 | Telescopic Way Cover | 4× | |
| 5 | Leveling Foot | 6× | |
| 6 | Fastener Set | 1× | Bolts, nuts, and washers. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Base & Ways
6 top-level lines · 6 rows shown · 16 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Base Casting | camshaft-grinder-base-casting | 1× | 1 | · | part |
| 2 | Longitudinal (Z) Way | camshaft-grinder-z-way | 2× | 2 | · | part |
| 3 | Wheelhead (X) Way | camshaft-grinder-x-way | 2× | 2 | · | part |
| 4 | Telescopic Way Cover | camshaft-grinder-way-cover | 4× | 4 | · | part |
| 5 | Leveling Foot | camshaft-grinder-leveling-foot | 6× | 6 | · | part |
| 6 | Fastener Set | fastener-set | 1× | 1 | · | part |
Where the base & ways is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |