Capstan Turret
AssemblySix-station turret on the capstan slide that indexes a new tool on each return stroke. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Capstan Turret parts and their functions
4 top-level parts · 12 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Turret Head | 1× | Six-faced head, each face bored for a tool holder. |
| 2 | Indexing Mechanism 4 parts | 1× | Steps and locks the turret to the next station as the slide returns. |
| 3 | Turret Tool Holder | 6× | Holder for a drill, die head, knee tool or box tool. |
| 4 | Turret Clamp | 1× |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Capstan Turret
4 top-level lines · 8 rows shown · 12 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Turret Head | capstan-lathe-turret-head | 1× | 1 | · | part |
| 2 | Indexing Mechanism 4 parts | capstan-lathe-index-mechanism | 1× | 1 | 4 | assembly |
| 2.1 | Geneva Cam | capstan-lathe-geneva-cam | 1× | 1 | · | part |
| 2.2 | Index Plunger | capstan-lathe-index-plunger | 1× | 1 | · | part |
| 2.3 | Coil Spring | coil-spring | 1× | 1 | · | part |
| 2.4 | Helical Gear Pair | gear-pair | 1× | 1 | · | part |
| 3 | Turret Tool Holder | capstan-lathe-turret-tool | 6× | 6 | · | part |
| 4 | Turret Clamp | capstan-lathe-turret-clamp | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the capstan turret is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |