BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Work Rest Unit

Assembly

Angled-top blade and holder supporting the workpiece above wheel centerline, the geometric trick that rounds the part. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Work Rest Unit parts and their functions

5 top-level parts · 6 parts in total · full bill of materials below
Work Rest Unit parts diagram: 1 work rest blade, 2 blade holder, 3 blade height adjustment, 4 work guides, 5 part ejector. 6 parts in 5 top-level items.
Work Rest Unit parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Work Rest Blade 1× Carbide-topped rest blade
2 Blade Holder 1× Blade clamp holder
3 Blade Height Adjustment 1× Blade height adjustment
4 Work Guides 2× Entry and exit guides
5 Part Ejector 1× Infeed part ejector

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Work Rest Unit

5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Work Rest Blade centerless-grinder-blade 1× 1 · part
2 Blade Holder centerless-grinder-blade-holder 1× 1 · part
3 Blade Height Adjustment centerless-grinder-height-adjust 1× 1 · part
4 Work Guides centerless-grinder-guides 2× 2 · part
5 Part Ejector centerless-grinder-ejector 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the work rest unit is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks