Clamping Vise Unit
AssemblyHydraulic vise that grips the bar on the machine centreline so it cannot turn or shift under the cutting load. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Clamping Vise Unit parts and their functions
7 top-level parts · 9 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Vise Body | 1× | Vise body casting |
| 2 | Vise Jaw | 2× | Fixed + moving jaws |
| 3 | Vee Location Block | 2× | Prism location blocks |
| 4 | Clamp Cylinder | 1× | Hydraulic clamp cylinder |
| 5 | Stock End Stop | 1× | Adjustable end stop |
| 6 | Pressure Sensor | 1× | Clamp pressure switch |
| 7 | Fastener Set | 1× | Bolts, nuts, and washers. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Clamping Vise Unit
7 top-level lines · 7 rows shown · 9 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Vise Body | chamfering-machine-vise-body | 1× | 1 | · | part |
| 2 | Vise Jaw | chamfering-machine-vise-jaw | 2× | 2 | · | part |
| 3 | Vee Location Block | chamfering-machine-vee-block | 2× | 2 | · | part |
| 4 | Clamp Cylinder | chamfering-machine-clamp-cylinder | 1× | 1 | · | part |
| 5 | Stock End Stop | chamfering-machine-stock-stop | 1× | 1 | · | part |
| 6 | Pressure Sensor | pressure-sensor | 1× | 1 | · | part |
| 7 | Fastener Set | fastener-set | 1× | 1 | · | part |
Where the clamping vise unit is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |