Machine Frame & Guarding
AssemblyWelded base structure with safety guarding. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Machine Frame & Guarding parts and their functions
6 top-level parts · 19 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Base Frame | 1× | Rigid welded base carrying the tank and column loads. |
| 2 | Lift Column | 2× | Lift axis columns |
| 3 | Sheet Metal Panel | 8× | Guard panels |
| 4 | Interlocked Guard Door | 1× | Access door with a safety interlock that stops motion when opened. |
| 5 | Leveling Foot | 6× | Adjustable foot for setting the machine level on the floor. |
| 6 | Fastener Set | 1× | Bolts, nuts, and washers. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Machine Frame & Guarding
6 top-level lines · 6 rows shown · 19 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Base Frame | drag-finishing-machine-base-frame | 1× | 1 | · | part |
| 2 | Lift Column | drag-finishing-machine-column | 2× | 2 | · | part |
| 3 | Sheet Metal Panel | sheet-panel | 8× | 8 | · | part |
| 4 | Interlocked Guard Door | drag-finishing-machine-guard-door | 1× | 1 | · | part |
| 5 | Leveling Foot | drag-finishing-machine-leveling-foot | 6× | 6 | · | part |
| 6 | Fastener Set | fastener-set | 1× | 1 | · | part |
Where the machine frame & guarding is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |