Control Cabinet
AssemblyCNC, drives, and process control coordinating feed, current, electrolyte flow, and chemistry into a regulated dissolution cycle. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Control Cabinet parts and their functions
8 top-level parts · 15 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Process CNC | 1× | Process CNC controller |
| 2 | Process PLC | 1× | Electrolyte and chemistry PLC |
| 3 | Servo Drive | 1× | Feed axis servo amplifier |
| 4 | Power Supply | 1× | Cabinet control supply |
| 5 | Operator Panel | 1× | Operator HMI |
| 6 | Relay | 8× | Interlock and valve relays |
| 7 | Wire Bundle | 1× | Cabinet wiring harness |
| 8 | LCD Panel | 1× | Process display |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Control Cabinet
8 top-level lines · 8 rows shown · 15 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Process CNC | ecm-cnc-unit | 1× | 1 | · | part |
| 2 | Process PLC | ecm-process-plc | 1× | 1 | · | part |
| 3 | Servo Drive | ecm-servo-drive | 1× | 1 | · | part |
| 4 | Power Supply | power-supply | 1× | 1 | · | part |
| 5 | Operator Panel | ecm-operator-panel | 1× | 1 | · | part |
| 6 | Relay | relay | 8× | 8 | · | part |
| 7 | Wire Bundle | wire-bundle | 1× | 1 | · | part |
| 8 | LCD Panel | lcd-panel | 1× | 1 | · | part |
Where the control cabinet is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |