Dielectric Tank and Filtration
AssemblyReservoir, filtration, and deionizer keeping the working fluid clean and at a controlled conductivity so the spark gap behaves consistently. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Dielectric Tank and Filtration parts and their functions
7 top-level parts · 8 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Dielectric Tank | 1× | Fluid reservoir |
| 2 | Return Pump | 1× | Tank return pump |
| 3 | Filter Cartridge | 2× | Spent-fluid filter cartridges |
| 4 | Deionizer Resin Bed | 1× | Deionizing resin bed |
| 5 | Conductivity Cell | 1× | Conductivity probe |
| 6 | Fluid Chiller | 1× | Fluid temperature control |
| 7 | O-Ring Set | 1× | Plumbing seals |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Dielectric Tank and Filtration
7 top-level lines · 7 rows shown · 8 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Dielectric Tank | edh-dielectric-tank | 1× | 1 | · | part |
| 2 | Return Pump | edh-return-pump | 1× | 1 | · | part |
| 3 | Filter Cartridge | edh-paper-filter | 2× | 2 | · | part |
| 4 | Deionizer Resin Bed | edh-deionizer-resin | 1× | 1 | · | part |
| 5 | Conductivity Cell | edh-conductivity-cell | 1× | 1 | · | part |
| 6 | Fluid Chiller | edh-fluid-chiller | 1× | 1 | · | part |
| 7 | O-Ring Set | oring-set | 1× | 1 | · | part |
Where the dielectric tank and filtration is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |