BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

XYZ Positioning Table

Assembly

Three-axis cross table positioning the workpiece under the electrode to 1 micron so each hole lands on the programmed coordinate. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

XYZ Positioning Table parts and their functions

5 top-level parts · 86 parts in total · full bill of materials below
XYZ Positioning Table parts diagram: 1 x-axis slide, 2 y-axis slide, 3 z-axis column, 4 workpiece clamp, 5 work tank. 86 parts in 5 assemblies.
XYZ Positioning Table parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 X-Axis Slide 4 parts 1× X cross slide
2 Y-Axis Slide 4 parts 1× Y cross slide
3 Z-Axis Column 4 parts 1× Z head elevation axis
4 Workpiece Clamp 1× Workpiece clamping fixture
5 Work Tank 1× Submersion work tank

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for XYZ Positioning Table

5 top-level lines · 29 rows shown · 86 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 X-Axis Slide 4 parts edh-x-axis 1× 1 28 assembly
1.1 Ball Screw ball-screw 1× 1 · part
1.2 Linear Guide Rail linear-guide 2× 2 · part
1.3 Servo Motor 4 parts servo-motor 1× 1 24 assembly
1.3.1 Stator Assembly 3 parts + deeper › stator-assembly 1× 1 3 assembly
1.3.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1× 1 19 assembly
1.3.3 Encoder encoder 1× 1 · part
1.3.4 Motor Housing motor-housing 1× 1 · part
1.4 Glass Position Scale edh-glass-scale 1× 1 · part
2 Y-Axis Slide 4 parts edh-y-axis 1× 1 28 assembly
2.1 Ball Screw ball-screw 1× 1 · part
2.2 Linear Guide Rail linear-guide 2× 2 · part
2.3 Servo Motor 4 parts servo-motor 1× 1 24 assembly
2.3.1 Stator Assembly 3 parts + deeper › stator-assembly 1× 1 3 assembly
2.3.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1× 1 19 assembly
2.3.3 Encoder encoder 1× 1 · part
2.3.4 Motor Housing motor-housing 1× 1 · part
2.4 Glass Position Scale edh-glass-scale 1× 1 · part
3 Z-Axis Column 4 parts edh-z-column 1× 1 28 assembly
3.1 Ball Screw ball-screw 1× 1 · part
3.2 Linear Guide Rail linear-guide 2× 2 · part
3.3 Servo Motor 4 parts servo-motor 1× 1 24 assembly
3.3.1 Stator Assembly 3 parts + deeper › stator-assembly 1× 1 3 assembly
3.3.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1× 1 19 assembly
3.3.3 Encoder encoder 1× 1 · part
3.3.4 Motor Housing motor-housing 1× 1 · part
3.4 Glass Position Scale edh-glass-scale 1× 1 · part
4 Workpiece Clamp edh-work-clamp 1× 1 · part
5 Work Tank edh-work-tank 1× 1 · part

Where the XYZ positioning table is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks