Coolant System
AssemblyCoolant supply tuned for high-speed finishing: flood for roughing, mist or air blast for delicate finishing, and through-spindle coolant for deep features, with chips cleared from the tilting work zone. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Coolant System parts and their functions
7 top-level parts · 7 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Coolant Tank | 1× | Coolant reservoir with chiller, 200-500 liters |
| 2 | Flood Pump | 1× | Flood coolant pump |
| 3 | Through-Spindle Pump | 1× | Through-spindle coolant pump, 40-70 bar |
| 4 | Air Blast Unit | 1× | Air blast and minimum-quantity lubrication |
| 5 | Chip Conveyor | 1× | Chip conveyor |
| 6 | Coolant Filter | 1× | Fine coolant filter |
| 7 | O-Ring Set | 1× | Coolant fitting seals |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Coolant System
7 top-level lines · 7 rows shown · 7 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Coolant Tank | fax-coolant-tank | 1× | 1 | · | part |
| 2 | Flood Pump | fax-flood-pump | 1× | 1 | · | part |
| 3 | Through-Spindle Pump | fax-tsc-pump | 1× | 1 | · | part |
| 4 | Air Blast Unit | fax-air-blast | 1× | 1 | · | part |
| 5 | Chip Conveyor | vmc-chip-conveyor | 1× | 1 | · | part |
| 6 | Coolant Filter | vmc-coolant-filter | 1× | 1 | · | part |
| 7 | O-Ring Set | oring-set | 1× | 1 | · | part |
Where the coolant system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $5–$2k. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| kbl.co.in ↗ | Pune, IN | Pumps & fluid systems | 200 units | 6–10 wks |
| leo.com.cn ↗ | Taizhou, CN | Pumps | 200 units | 6–10 wks |
| shaktipumps.com ↗ | Pithampur, IN | Pumps | 200 units | 6–10 wks |
| cnppumps.com ↗ | Hangzhou, CN | Pumps | 200 units | 6–10 wks |
| rotopumps.com ↗ | Noida, IN | Pumps | 200 units | 6–10 wks |