Tool Changer
AssemblyAn automatic changer and a tool-measuring system. Five-axis cycles use many small tools, and accurate tool length is critical because the toolpath is computed in three dimensions around the tip. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Tool Changer parts and their functions
7 top-level parts · 37 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Tool Magazine | 1× | Chain or matrix tool magazine, 30-60 tools |
| 2 | Tool Change Arm | 1× | Swing-arm tool changer |
| 3 | Tool Pocket | 30× | Tool holder pockets |
| 4 | Laser Tool Setter | 1× | Laser tool measurement unit |
| 5 | Magazine Motor | 1× | Magazine index motor |
| 6 | Helical Gear Pair | 1× | Changer cam gearing |
| 7 | Relay | 2× | Changer interlock relays |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Tool Changer
7 top-level lines · 7 rows shown · 37 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Tool Magazine | fax-tool-magazine | 1× | 1 | · | part |
| 2 | Tool Change Arm | fax-changer-arm | 1× | 1 | · | part |
| 3 | Tool Pocket | fax-tool-pocket | 30× | 30 | · | part |
| 4 | Laser Tool Setter | fax-laser-tool-setter | 1× | 1 | · | part |
| 5 | Magazine Motor | fax-magazine-motor | 1× | 1 | · | part |
| 6 | Helical Gear Pair | gear-pair | 1× | 1 | · | part |
| 7 | Relay | relay | 2× | 2 | · | part |
Where the tool changer is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |