BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Control System

Assembly

PLC managing spindle ramp, forge pressure profile, and weld timer. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Control System parts and their functions

7 top-level parts · 7 parts in total · full bill of materials below
Control System parts diagram: 1 PLC controller, 2 speed control, 3 weld timer, 4 ramp timer, 5 pressure feedback, 6 speed sensor, 7 power supply. 7 parts in 7 top-level items.
Control System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 PLC Controller 1× Industrial PLC with analog outputs for VFD and solenoid valve
2 Speed Control 1× 0–3000 rpm potentiometer or touchscreen input
3 Weld Timer 1× 0–30 second weld timer (contact time under pressure)
4 Ramp Timer 1× 0–10 second spindle ramp-up time
5 Pressure Feedback 1× 0–10 VDC pressure transducer feedback from forge cylinder
6 Speed Sensor 1× Tachometer feedback confirming spindle speed
7 Power Supply 1× 24 VDC regulated supply for PLC and solenoid valves

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Control System

7 top-level lines · 7 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 PLC Controller friction-welding-machine-plc 1× 1 · part
2 Speed Control friction-welding-machine-spindle-speed-knob 1× 1 · part
3 Weld Timer friction-welding-machine-forge-time-dial 1× 1 · part
4 Ramp Timer friction-welding-machine-spindle-ramp-dial 1× 1 · part
5 Pressure Feedback friction-welding-machine-pressure-feedback 1× 1 · part
6 Speed Sensor friction-welding-machine-spindle-speed-sensor 1× 1 · part
7 Power Supply power-supply 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the control system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks