BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Bed and Base

Assembly

Heavy cast bed locating column and table, with leveling, chip drainage, and the main motor mount. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bed and Base parts and their functions

6 top-level parts · 11 parts in total · full bill of materials below
Bed and Base parts diagram: 1 bed casting, 2 leveling wedge, 3 chip tray, 4 main motor, 5 drive belt, 6 machine guarding. 11 parts in 6 top-level items.
Bed and Base parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Bed Casting 1× Machine bed
2 Leveling Wedge 6× Leveling wedges
3 Chip Tray 1× Chip and oil tray
4 Main Motor 1× Main drive motor
5 Drive Belt 1× Primary belt drive
6 Machine Guarding 1× Splash enclosure

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Bed and Base

6 top-level lines · 6 rows shown · 11 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Bed Casting gear-shaper-bed-casting 1× 1 · part
2 Leveling Wedge gear-shaper-leveling-set 6× 6 · part
3 Chip Tray gear-shaper-chip-tray 1× 1 · part
4 Main Motor gear-shaper-main-motor 1× 1 · part
5 Drive Belt drive-belt 1× 1 · part
6 Machine Guarding gear-shaper-guarding 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the bed and base is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks