Bed and Rails
AssemblyA long, heavy fixed bed bolted to a reinforced foundation, carrying the floor-level X-axis rails the gantry rides on. Gantry machines handle workpieces meters long, so the bed is the largest single structure and is often shipped in sections. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bed and Rails parts and their functions
6 top-level parts · 11 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Bed Section | 4× | Cast iron or fabricated bed sections |
| 2 | X Rail | 2× | Ground X-axis guide rails along the bed |
| 3 | T-Slot Table | 1× | T-slotted clamping surface on the bed |
| 4 | Drive Rack | 2× | Drive rack along each X rail |
| 5 | Foundation Anchor Set | 1× | Foundation anchor and grout set |
| 6 | Fastener Set | 1× | Bed joining bolts and dowels |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Bed and Rails
6 top-level lines · 6 rows shown · 11 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Bed Section | gmm-bed-section | 4× | 4 | · | part |
| 2 | X Rail | gmm-x-rail | 2× | 2 | · | part |
| 3 | T-Slot Table | gmm-t-slot-table | 1× | 1 | · | part |
| 4 | Drive Rack | gmm-rack | 2× | 2 | · | part |
| 5 | Foundation Anchor Set | gmm-anchor-set | 1× | 1 | · | part |
| 6 | Fastener Set | fastener-set | 1× | 1 | · | part |
Where the bed and rails is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |