Control Cabinet
AssemblyThe CNC, servo drives, and PLC that run the machine, coordinate the pallet and tool changers, and support unattended scheduling. Production HMCs lean heavily on the control to run lights-out for hours. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Control Cabinet parts and their functions
7 top-level parts · 11 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | CNC Control | 1× | CNC with 4-axis interpolation |
| 2 | Servo Amplifier | 5× | Servo amplifiers for spindle, 3 axes, rotary |
| 3 | Operator Panel | 1× | Operator console |
| 4 | Power Supply | 1× | DC bus and control power |
| 5 | Machine PLC | 1× | PLC for pallet, tool, and coolant logic |
| 6 | LCD Panel | 1× | Control display screen |
| 7 | Wire Bundle | 1× | Cabinet wiring harness |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Control Cabinet
7 top-level lines · 7 rows shown · 11 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | CNC Control | hmc-cnc-control | 1× | 1 | · | part |
| 2 | Servo Amplifier | hmc-servo-amp | 5× | 5 | · | part |
| 3 | Operator Panel | hmc-operator-panel | 1× | 1 | · | part |
| 4 | Power Supply | power-supply | 1× | 1 | · | part |
| 5 | Machine PLC | hmc-plc | 1× | 1 | · | part |
| 6 | LCD Panel | lcd-panel | 1× | 1 | · | part |
| 7 | Wire Bundle | wire-bundle | 1× | 1 | · | part |
Where the control cabinet is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |