Control Cabinet and Safety
AssemblyMain power distribution, soft-start, E-stop circuit, and safety interlocks. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Control Cabinet and Safety parts and their functions
4 top-level parts · 4 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Main Contactor | 1× | 3-phase contactor, 63–100 A, main power switching |
| 2 | E-Stop Relay Module | 1× | Safety-rated emergency stop relay module |
| 3 | Soft-Start Unit | 1× | Electronic soft-start reducing inrush current |
| 4 | Isolating Disconnector | 1× | Manual isolating switch with lockout provision |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Control Cabinet and Safety
4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Main Contactor | induction-heat-treat-main-contactor | 1× | 1 | · | part |
| 2 | E-Stop Relay Module | induction-heat-treat-estop-relay | 1× | 1 | · | part |
| 3 | Soft-Start Unit | induction-heat-treat-soft-starter | 1× | 1 | · | part |
| 4 | Isolating Disconnector | induction-heat-treat-disconnector | 1× | 1 | · | part |
Where the control cabinet and safety is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |