BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Cooling Loops

Assembly

Separate chilled water or oil cooling loops for induction coil and quench system components. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Cooling Loops parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Cooling Loops parts diagram: 1 coil cooler, 2 coil cooling pump, 3 quench cooler, 4 thermostatic control valve. 4 parts in 4 top-level items.
Cooling Loops parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Coil Cooler 1× Small plate-fin copper heat exchanger for coil cooling, 10–30 kW
2 Coil Cooling Pump 1× Gear pump, 5–15 cc/rev, circulating coil cooling water
3 Quench Cooler 1× Larger heat exchanger cooling quench fluid return, 20–50 kW
4 Thermostatic Control Valve 1× 3-way thermostatic valve maintaining fluid at 40–50 °C

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Cooling Loops

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Coil Cooler induction-heat-treat-coil-cooler 1× 1 · part
2 Coil Cooling Pump induction-heat-treat-coil-pump 1× 1 · part
3 Quench Cooler induction-heat-treat-quench-cooler 1× 1 · part
4 Thermostatic Control Valve induction-heat-treat-thermostatic-valve 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the cooling loops is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks