BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Water Chiller

Assembly

The chiller that holds the laser source and optics within a tight temperature band. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Water Chiller parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Water Chiller parts diagram: 1 compressor, 2 coolant pump, 3 heat exchanger, 4 coolant tank, 5 pressure sensor. 5 parts in 5 top-level items.
Water Chiller parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Compressor 1× Refrigeration compressor
2 Coolant Pump 1× Coolant pump
3 Heat Exchanger 1× Heat exchanger
4 Coolant Tank 1× Coolant tank
5 Pressure Sensor 1× Coolant flow sensor

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Water Chiller

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Compressor laser-tube-cutting-machine-compressor 1× 1 · part
2 Coolant Pump laser-tube-cutting-machine-coolant-pump 1× 1 · part
3 Heat Exchanger laser-tube-cutting-machine-heat-exchanger 1× 1 · part
4 Coolant Tank laser-tube-cutting-machine-coolant-tank 1× 1 · part
5 Pressure Sensor pressure-sensor 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the water chiller is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks