BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Machine Base and Slides

Assembly

Ribbed grey cast-iron base 1.5 to 3 m long carrying the headstock, tailstock, and shoe-head slides on hardened ways, damping the high-frequency oscillation without resonance. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Machine Base and Slides parts and their functions

5 top-level parts · 23 parts in total · full bill of materials below
Machine Base and Slides parts diagram: 1 base casting, 2 shoe-head cross slide, 3 linear guide rail, 4 leveling mount, 5 way cover. 23 parts in 5 top-level items.
Machine Base and Slides parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Base Casting 1× Stress-relieved iron casting
2 Shoe-Head Cross Slide 4× Shoe-head cross slides
3 Linear Guide Rail 8× Slide rolling guides
4 Leveling Mount 6× Foundation leveling feet
5 Way Cover 4× Telescopic way covers

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Machine Base and Slides

5 top-level lines · 5 rows shown · 23 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Base Casting mfm-base-casting 1× 1 · part
2 Shoe-Head Cross Slide mfm-linear-slide 4× 4 · part
3 Linear Guide Rail linear-guide 8× 8 · part
4 Leveling Mount mfm-leveling-mount 6× 6 · part
5 Way Cover mfm-way-cover 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the machine base and slides is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks