BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Cutoff and Transfer

Assembly

The shear that cuts each slug to length and the fingers that carry it from station to station. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Cutoff and Transfer parts and their functions

5 top-level parts · 12 parts in total · full bill of materials below
Cutoff and Transfer parts diagram: 1 cutoff knife, 2 cutoff quill, 3 transfer finger, 4 transfer cam, 5 coil spring. 12 parts in 5 top-level items.
Cutoff and Transfer parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cutoff Knife 1× Cutoff knife
2 Cutoff Quill 1× Cutoff quill
3 Transfer Finger 5× Transfer fingers
4 Transfer Cam 1× Transfer cam
5 Coil Spring 4× Finger springs

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Cutoff and Transfer

5 top-level lines · 5 rows shown · 12 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cutoff Knife nut-forming-machine-cutoff-knife 1× 1 · part
2 Cutoff Quill nut-forming-machine-cutoff-quill 1× 1 · part
3 Transfer Finger nut-forming-machine-transfer-finger 5× 5 · part
4 Transfer Cam nut-forming-machine-transfer-cam 1× 1 · part
5 Coil Spring coil-spring 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the cutoff and transfer is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks