BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Main Frame

Assembly

The heavy cast bed and crankcase that carry the forming loads, which run into hundreds of kilonewtons per blow. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Main Frame parts and their functions

5 top-level parts · 8 parts in total · full bill of materials below
Main Frame parts diagram: 1 bed casting, 2 tie rod, 3 die breast, 4 forming guard, 5 fastener set. 8 parts in 5 top-level items.
Main Frame parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Bed Casting 1× Bed casting
2 Tie Rod 4× Pre-load tie rods
3 Die Breast 1× Die breast
4 Forming Guard 1× Forming-zone guard
5 Fastener Set 1× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Main Frame

5 top-level lines · 5 rows shown · 8 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Bed Casting nut-forming-machine-bed-casting 1× 1 · part
2 Tie Rod nut-forming-machine-tie-rod 4× 4 · part
3 Die Breast nut-forming-machine-die-breast 1× 1 · part
4 Forming Guard nut-forming-machine-guard 1× 1 · part
5 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the main frame is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks