Safety Guarding
AssemblyFront finger guard, rear guard, and emergency stops. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Safety Guarding parts and their functions
6 top-level parts · 10 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Front Finger Guard | 1× | Slotted guard letting plate through while keeping fingers clear of the blade. |
| 2 | Rear Guard | 1× | Fixed guard enclosing the back-gauge and beam travel. |
| 3 | Emergency Stop Button | 3× | |
| 4 | Safety Light Curtain | 1× | Optical guard that halts the stroke if the beam line is broken. |
| 5 | Sheet Metal Panel | 3× | Flat or folded sheet-metal panel, cut and bent to shape, that forms the enclosure, guards, or skin of a machine. |
| 6 | Fastener Set | 1× | Bolts, nuts, and washers. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Safety Guarding
6 top-level lines · 6 rows shown · 10 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Front Finger Guard | plate-shear-front-finger-guard | 1× | 1 | · | part |
| 2 | Rear Guard | plate-shear-rear-guard | 1× | 1 | · | part |
| 3 | Emergency Stop Button | plate-shear-estop | 3× | 3 | · | part |
| 4 | Safety Light Curtain | plate-shear-light-curtain | 1× | 1 | · | part |
| 5 | Sheet Metal Panel | sheet-panel | 3× | 3 | · | part |
| 6 | Fastener Set | fastener-set | 1× | 1 | · | part |
Where the safety guarding is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |