Manual Lever Press
AssemblyHand-operated lever mechanism amplifying operator force 5–10× for stretching or reducing rings. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Manual Lever Press parts and their functions
5 top-level parts · 5 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Lever Arm | 1× | Long steel lever 12–18 inches with ergonomic grip handle |
| 2 | Lever Pivot Bearing | 1× | Ball bearing pivot point mounted to frame |
| 3 | Lever Linkage Rod | 1× | Steel rod connecting lever to mandrel wedge or reduction cam |
| 4 | Lever Return Spring | 1× | Return spring opening lever after pressing |
| 5 | Lever Travel Stop | 1× | Adjustable mechanical stop limiting maximum lever travel |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Manual Lever Press
5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Lever Arm | ring-stretcher-lever-arm | 1× | 1 | · | part |
| 2 | Lever Pivot Bearing | ring-stretcher-lever-pivot | 1× | 1 | · | part |
| 3 | Lever Linkage Rod | ring-stretcher-lever-linkage | 1× | 1 | · | part |
| 4 | Lever Return Spring | ring-stretcher-lever-spring | 1× | 1 | · | part |
| 5 | Lever Travel Stop | ring-stretcher-lever-stop | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the manual lever press is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |