BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Lubrication System

Assembly

The high-pressure oil system that floods the forming zone, since cold forming needs heavy lubrication. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Lubrication System parts and their functions

5 top-level parts · 6 parts in total · full bill of materials below
Lubrication System parts diagram: 1 oil pump, 2 oil tank, 3 flood nozzle, 4 oil filter, 5 pressure sensor. 6 parts in 5 assemblies.
Lubrication System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Oil Pump Oil pump
2 Oil Tank Oil tank
3 Flood Nozzle Flood nozzles
4 Oil Filter Oil filter
5 Pressure Sensor Oil pressure sensor

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Lubrication System

5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Oil Pump roll-tapping-machine-pump 1 · part
2 Oil Tank roll-tapping-machine-tank 1 · part
3 Flood Nozzle roll-tapping-machine-nozzle 2 · part
4 Oil Filter roll-tapping-machine-filter 1 · part
5 Pressure Sensor pressure-sensor 1 · part

Where the lubrication system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks