BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Machine Base and Slideways

Assembly

Stress-relieved grey cast-iron base carrying the workhead, oscillation head, and slides, damping the high-frequency vibration the oscillating stone would otherwise transmit. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Machine Base and Slideways parts and their functions

5 top-level parts · 12 parts in total · full bill of materials below
Machine Base and Slideways parts diagram: 1 base casting, 2 linear guide rail, 3 way cover, 4 leveling mount, 5 way lubrication pump. 12 parts in 5 top-level items.
Machine Base and Slideways parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Base Casting 1× Ribbed grey iron casting
2 Linear Guide Rail 2× Cross-slide guideways
3 Way Cover 2× Telescopic way covers
4 Leveling Mount 6× Foundation leveling feet
5 Way Lubrication Pump 1× Automatic slideway lubrication

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Machine Base and Slideways

5 top-level lines · 5 rows shown · 12 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Base Casting sfm-base-casting 1× 1 · part
2 Linear Guide Rail linear-guide 2× 2 · part
3 Way Cover sfm-way-cover 2× 2 · part
4 Leveling Mount sfm-leveling-mount 6× 6 · part
5 Way Lubrication Pump sfm-lube-pump 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the machine base and slideways is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks