Air Supply + Prep

Assembly

Air preparation train that dries and regulates the shop compressed air feeding the nozzles; dry air at a steady pressure is needed for stable blast intensity. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Air Supply + Prep parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Air Supply + Prep parts diagram: 1 air dryer, 2 pressure regulator, 3 air Filter/Separator, 4 air receiver, 5 pressure sensor. 5 parts in 5 top-level items.
Air Supply + Prep parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Air Dryer 1× Air dryer
2 Pressure Regulator 1× Pressure regulator
3 Air Filter/Separator 1× Air filter/separator
4 Air Receiver 1× Air receiver
5 Pressure Sensor 1× Line pressure sensor

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Air Supply + Prep

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Air Dryer shot-peening-machine-air-dryer 1× 1 · part
2 Pressure Regulator shot-peening-machine-air-regulator 1× 1 · part
3 Air Filter/Separator shot-peening-machine-air-filter 1× 1 · part
4 Air Receiver shot-peening-machine-air-receiver 1× 1 · part
5 Pressure Sensor pressure-sensor 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the air supply + prep is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks