Machine Base

Assembly

Heavy cast base that carries the two grinding spindles and the carrier disc on a common rigid frame. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Machine Base parts and their functions

5 top-level parts · 10 parts in total · full bill of materials below
Machine Base parts diagram: 1 cast-iron bed, 2 spindle column, 3 leveling foot, 4 coolant tray, 5 fastener set. 10 parts in 5 top-level items.
Machine Base parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cast-Iron Bed 1× Ribbed cast-iron bed
2 Spindle Column 1× Upper-spindle column
3 Leveling Foot 6× Adjustable feet
4 Coolant Tray 1× Drip tray + drain
5 Fastener Set 1× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Machine Base

5 top-level lines · 5 rows shown · 10 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cast-Iron Bed spring-grinding-machine-base-casting 1× 1 · part
2 Spindle Column spring-grinding-machine-column 1× 1 · part
3 Leveling Foot spring-grinding-machine-leveling-foot 6× 6 · part
4 Coolant Tray spring-grinding-machine-coolant-tray 1× 1 · part
5 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the machine base is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks