BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r165569 of this page, not the current version. Go to current · history

Entry Section

Assembly

Pays the coil off, centers the strip and builds the entry-side tension that the leveler stretches against. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Entry Section

6 top-level lines as of r165569
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Uncoiler 6 parts stl-uncoiler 1× 1 0 assembly
2 Entry Bridle 4 parts stl-entry-bridle 1× 1 0 assembly
3 Strip Edge Guide 3 parts stl-edge-guide 1× 1 0 assembly
4 Pinch Roll Unit 4 parts stl-pinch-roll 1× 1 0 assembly
5 Deflector Roll stl-deflector-roll 2× 2 · part
6 Snubber Roll stl-snubber-roll 1× 1 · part