BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Travel Carriage

Assembly

Motorized gantry frame mounting welding head and moving along workpiece at constant travel speed. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Travel Carriage parts and their functions

6 top-level parts · 6 parts in total · full bill of materials below
Travel Carriage parts diagram: 1 travel motor, 2 travel screw, 3 carriage frame, 4 linear guide, 5 encoder, 6 drive coupling. 6 parts in 6 top-level items.
Travel Carriage parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Travel Motor 1× 0.75 kW AC induction motor with speed controller
2 Travel Screw 1× Ballscrew or leadscrew driving carriage position
3 Carriage Frame 1× Welded aluminum or steel beam structure
4 Linear Guide 1× Precision roller or ball-bushing bearing carriage
5 Encoder 1× Position encoder on travel motor shaft for feedback
6 Drive Coupling 1× Flexible coupling isolating motor from ballscrew

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Travel Carriage

6 top-level lines · 6 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Travel Motor submerged-arc-welder-travel-motor 1× 1 · part
2 Travel Screw submerged-arc-welder-travel-screw 1× 1 · part
3 Carriage Frame submerged-arc-welder-carriage-frame 1× 1 · part
4 Linear Guide submerged-arc-welder-linear-guide 1× 1 · part
5 Encoder encoder 1× 1 · part
6 Drive Coupling submerged-arc-welder-drive-coupling 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the travel carriage is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks