BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

End of Line

Assembly

The exit conveyor, inspection, and stacker that carry finished panels out, check them, and rack them for the body shop. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

End of Line parts and their functions

5 top-level parts · 144 parts in total · full bill of materials below
End of Line parts diagram: 1 exit conveyor, 2 inspection station, 3 panel stacker, 4 shipping rack, 5 drive belt. 144 parts in 5 top-level items.
End of Line parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Exit Conveyor 1× Exit belt conveyor
2 Inspection Station 3 parts 1× Vision inspection
3 Panel Stacker 3 parts 1× Panel rack stacker
4 Shipping Rack 8× Shipping racks
5 Drive Belt 6× Conveyor belts

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for End of Line

5 top-level lines · 18 rows shown · 144 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Exit Conveyor tandem-press-line-exit-conveyor 1× 1 · part
2 Inspection Station 3 parts tandem-press-line-inspection-station 1× 1 11 assembly
2.1 Inspection Camera tandem-press-line-inspection-camera 6× 6 · part
2.2 Light Bank tandem-press-line-light-bank 4× 4 · part
2.3 LCD Panel lcd-panel 1× 1 · part
3 Panel Stacker 3 parts tandem-press-line-panel-stacker 1× 1 118 assembly
3.1 Stacker Robot tandem-press-line-stacker-robot 2× 2 · part
3.2 End Effector 3 parts tandem-press-line-end-effector 2× 2 10 assembly
3.2.1 Tooling Frame tandem-press-line-tooling-frame 1× 2 · part
3.2.2 Vacuum Cup tandem-press-line-vacuum-cup 8× 16 · part
3.2.3 Quick Coupler tandem-press-line-quick-coupler 1× 2 · part
3.3 Servo Motor 4 parts servo-motor 4× 4 24 assembly
3.3.1 Stator Assembly 3 parts + deeper › stator-assembly 1× 4 3 assembly
3.3.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1× 4 19 assembly
3.3.3 Encoder encoder 1× 4 · part
3.3.4 Motor Housing motor-housing 1× 4 · part
4 Shipping Rack tandem-press-line-rack 8× 8 · part
5 Drive Belt drive-belt 6× 6 · part

Something wrong in this list? Report a problem with this BOM.

Where the end of line is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks