Bed & Ways
AssemblyRigid cast bed carrying the headstock, tailstock and slides. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bed & Ways parts and their functions
6 top-level parts · 18 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Cast Iron Bed | 1× | Ribbed Meehanite casting, stress-relieved and aged. |
| 2 | Hardened Slideway | 4× | Hardened and ground V/flat way, hand-scraped to the bed. |
| 3 | Linear Guide Rail | 2× | Ground steel rail and recirculating-ball carriage that guide a moving axis in a straight line with high stiffness and low friction. |
| 4 | Way Cover | 4× | Sheet cover keeping coolant and grit off the ways. |
| 5 | Leveling Foot | 6× | |
| 6 | Fastener Set | 1× | Bolts, nuts, and washers. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Bed & Ways
6 top-level lines · 6 rows shown · 18 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Cast Iron Bed | thread-grinding-machine-bed-casting | 1× | 1 | · | part |
| 2 | Hardened Slideway | thread-grinding-machine-slideway | 4× | 4 | · | part |
| 3 | Linear Guide Rail | linear-guide | 2× | 2 | · | part |
| 4 | Way Cover | thread-grinding-machine-way-cover | 4× | 4 | · | part |
| 5 | Leveling Foot | thread-grinding-machine-leveling-foot | 6× | 6 | · | part |
| 6 | Fastener Set | fastener-set | 1× | 1 | · | part |
Where the bed & ways is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |