Base, Saddle & Table
AssemblyCast foundation and stacked slides carrying the work past the wheel. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Base, Saddle & Table parts and their functions
6 top-level parts · 10 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Base Casting | 1× | Ribbed cast iron base damping vibration and carrying the column. |
| 2 | Cross Saddle | 1× | Saddle riding the base ways for cross travel. |
| 3 | Swivel Table | 1× | T-slotted table that swivels in plan for relief angles. |
| 4 | Hardened Slideway | 2× | Hardened and ground dovetail way, hand-scraped flat. |
| 5 | Way Wiper | 4× | Felt wiper keeping grit off the ground ways. |
| 6 | Fastener Set | 1× | Bolts, nuts, and washers. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Base, Saddle & Table
6 top-level lines · 6 rows shown · 10 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Base Casting | tool-and-cutter-grinder-base-casting | 1× | 1 | · | part |
| 2 | Cross Saddle | tool-and-cutter-grinder-saddle | 1× | 1 | · | part |
| 3 | Swivel Table | tool-and-cutter-grinder-table | 1× | 1 | · | part |
| 4 | Hardened Slideway | tool-and-cutter-grinder-slideway | 2× | 2 | · | part |
| 5 | Way Wiper | tool-and-cutter-grinder-way-wiper | 4× | 4 | · | part |
| 6 | Fastener Set | fastener-set | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the base, saddle & table is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $20–$800. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatseats.com ↗ | Gurugram, IN | Seating systems | 500 sets | 8–12 wks |
|
🇨🇳Yanfeng
yanfeng.com ↗
|
Shanghai, CN | Interiors & seating | 500 sets | 8–12 wks |
| haritaseating.com ↗ | Chennai, IN | Seating systems | 500 sets | 8–12 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 sets | 8–12 wks |
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 500 sets | 8–12 wks |