Cross-Slide Saddle
AssemblySlide moving the table toward and away from the column. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Cross-Slide Saddle parts and their functions
5 top-level parts · 5 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Saddle Casting | 1× | H-shaped casting with ways on top and bottom at right angles. |
| 2 | Cross-Feed Screw | 1× | |
| 3 | Cross-Feed Nut | 1× | Bronze nut, often split to take out backlash. |
| 4 | Cross Handwheel | 1× | |
| 5 | Saddle Gib | 1× |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Cross-Slide Saddle
5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Saddle Casting | turret-mill-saddle-casting | 1× | 1 | · | part |
| 2 | Cross-Feed Screw | turret-mill-cross-screw | 1× | 1 | · | part |
| 3 | Cross-Feed Nut | turret-mill-cross-nut | 1× | 1 | · | part |
| 4 | Cross Handwheel | turret-mill-cross-handwheel | 1× | 1 | · | part |
| 5 | Saddle Gib | turret-mill-saddle-gib | 1× | 1 | · | part |
Where the cross-slide saddle is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $20–$800. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatseats.com ↗ | Gurugram, IN | Seating systems | 500 sets | 8–12 wks |
|
🇨🇳Yanfeng
yanfeng.com ↗
|
Shanghai, CN | Interiors & seating | 500 sets | 8–12 wks |
| haritaseating.com ↗ | Chennai, IN | Seating systems | 500 sets | 8–12 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 sets | 8–12 wks |
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 500 sets | 8–12 wks |