BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r181879 of this page, not the current version. Go to current · history

Control Cabinet and Electrical

Assembly

Main power distribution, soft-start, control PLC, and safety interlocks. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Control Cabinet and Electrical

4 top-level lines as of r181879
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Main Disconnect Switch vacuum-heat-treat-furnace-main-switch 1× 1 · part
2 Soft-Start Controller vacuum-heat-treat-furnace-soft-starter 1× 1 · part
3 Main Contactor vacuum-heat-treat-furnace-main-contactor 1× 1 · part
4 E-Stop Safety Relay vacuum-heat-treat-furnace-estop-relay 1× 1 · part