BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Drain + Filtration

Assembly

Carries the spent process water out of the bowl, drops swarf and worn media fines in a settling tank, and either filters and recirculates the water or sends it to treatment. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Drain + Filtration parts and their functions

5 top-level parts · 30 parts in total · full bill of materials below
Drain + Filtration parts diagram: 1 bowl drain port, 2 settling tank, 3 bag filter, 4 recirculation pump, 5 o-ring set. 30 parts in 5 top-level items.
Drain + Filtration parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Bowl Drain Port 1× Bowl drain port
2 Settling Tank 1× Settling tank
3 Bag Filter 1× Bag filter
4 Recirculation Pump 3 parts 1× Recirculation pump
5 O-Ring Set 1× Drain seals

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Drain + Filtration

5 top-level lines · 12 rows shown · 30 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Bowl Drain Port vibratory-finishing-bowl-drain-port 1× 1 · part
2 Settling Tank vibratory-finishing-bowl-settling-tank 1× 1 · part
3 Bag Filter vibratory-finishing-bowl-bag-filter 1× 1 · part
4 Recirculation Pump 3 parts vibratory-finishing-bowl-recirc-pump 1× 1 26 assembly
4.1 Servo Motor 4 parts servo-motor 1× 1 24 assembly
4.1.1 Stator Assembly 3 parts + deeper › stator-assembly 1× 1 3 assembly
4.1.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1× 1 19 assembly
4.1.3 Encoder encoder 1× 1 · part
4.1.4 Motor Housing motor-housing 1× 1 · part
4.2 Pump Impeller vibratory-finishing-bowl-pump-impeller 1× 1 · part
4.3 Oil Seal oil-seal 1× 1 · part
5 O-Ring Set oring-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the drain + filtration is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks