BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Toroidal Process Bowl

Assembly

The donut-shaped steel channel that holds the parts and media; vibration drives the charge in a helical roll around the toroid so it climbs and turns continuously. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Toroidal Process Bowl parts and their functions

5 top-level parts · 9 parts in total · full bill of materials below
Toroidal Process Bowl parts diagram: 1 bowl shell, 2 polyurethane lining, 3 center hub, 4 spider arm, 5 fastener set. 9 parts in 5 top-level items.
Toroidal Process Bowl parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Bowl Shell 1× Steel bowl shell
2 Polyurethane Lining 1× Polyurethane lining
3 Center Hub 1× Center hub
4 Spider Arm 4× Spider arms to drive
5 Fastener Set 2× Lining + hub fasteners

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Toroidal Process Bowl

5 top-level lines · 5 rows shown · 9 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Bowl Shell vibratory-finishing-bowl-bowl-shell 1× 1 · part
2 Polyurethane Lining vibratory-finishing-bowl-pu-lining 1× 1 · part
3 Center Hub vibratory-finishing-bowl-center-hub 1× 1 · part
4 Spider Arm vibratory-finishing-bowl-spider-arm 4× 4 · part
5 Fastener Set fastener-set 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the toroidal process bowl is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks